Vicco OS
Precision fabrication · Houston, TX
OS

Welcome, Admin 👋

An overview of RFQs, quotes, jobs, and revenue analytics.

Total Revenue
attach_money

$525,000

+8.4% WoW
Total RFQs
request_page

86

+12.3% WoW
Active Jobs
precision_manufacturing

18

+9.1% WoW
Win Rate
emoji_events

72%

+4.0% WoW
Total Profit Overview
$98,643 +8.4%
Total Sales
Total Revenue
S

Shop

32 RFQ

F

Field

44 Job

O

Online

10 Quote

JanFebMarAprMayJunJulAug
Recent Activities
schedule

Sarah Miller created RFQ-8101

09:12 AM

New RFQ
schedule

John Davis converted RFQ-8083 to job

08:47 AM

Converted
schedule

Dave S. completed QC on J-826

08:02 AM

QC Passed
schedule

Invoice INV-1010 marked Paid

Yesterday

Paid
schedule

Template saved: Sheet Metal Parts

Yesterday

Saved
Weekly RFQs

RFQs received this week

12

+3 this week ↗across 4 clients
Jobs by Priority

Current workload by priority

Total Jobs

16

in the pipeline

In Production

7

running on the floor

Rush Jobs

3

expedited priority

Rush
High
Normal
Low
filter_list Filters

New RFQ

5
RFQ-8092 schedule 1d

Tesla Giga TX

Laser Cut Bracket Assm.

draw 2 DWGs
Assignee $2.5k Est.
RFQ-8095 schedule 2d

Boeing

Aircraft Brackets

draw 5 DWGs
JD
$8.9k Est.
RFQ-8091 schedule 4d

Lockheed Martin

Missile Components

draw 3 DWGs
MT
$15.2k Est.
RFQ-8090 schedule 1d

Northrop Grumman

Defense Parts

draw 4 DWGs
SM
$22.1k Est.

Quoting

2
RFQ-8088 schedule 3d

SpaceX Starbase

Alum 6061 Heat Sink

draw 1 DWG
JD
$12.4k
RFQ-8089 schedule 5d

General Electric

Turbine Components

draw 2 DWGs
MT
$18.7k

list_alt Active Quotes

Quote # Company Parts Value Margin Status Follow-up
Q-1045 SpaceX Starbase 4 $12,800 37% Sent Tomorrow
Q-1044 Texas Aero Parts 6 $15,900 40% Accepted 2 days ago
Q-1043 Gulf Coast Refining 8 $14,200 33% Sent in 2 days
Q-1042 GE Aviation 2 $19,400 40% Draft Tomorrow
Q-1041 Lockheed Martin 3 $16,400 42% Sent Today
Q-1040 Acme Industrial 12 $6,480 30% Accepted 4 days ago
Q-1039 Metro Transit Authority 20 $7,600 29% Expired 7 days ago
Q-1038 BuildTech Construction 10 $5,900 28% Draft in 3 days
Q-1045 Sent

SpaceX Starbase

notifications_active Follow-up scheduled tomorrow

DXF Preview (1 of 4) visibility
architecture

Material Specifications

Material Aluminum 6061-T6
Thickness 3/8" (0.375")
Est. Weight 85 lbs total
Scrap Rate 8%

Customer Notes

"Please ensure all burrs are removed on the internal cutouts. Tolerance critical on the main mounting holes (+/- 0.005"). Need delivery by end of month."

Quote History

Follow-up scheduled Today - System
Quote Sent to Customer Yesterday - John Davis
Quote Created 2 days ago - John Davis

Active Production

Real-time view of 42 active jobs across 5 stages.

engineering Operator Load

View Schedule
Dave S.
Dave S. J-882 • 75%
Maria G.
Maria G. J-901 • 20%
Tom H.
Tom H. Unassigned
Sarah J.
Sarah J. J-875 • 90%

To Do

4
J-905 Rush
Exxon Mobil

Fabricate 4x custom flange assemblies for offshore rig.

calendar_today Oct 28
person_add
J-912
BP

Standard pipeline brackets, batch of 50.

calendar_today Nov 02
person_add
J-915
Chevron

Custom valve components, stainless steel.

calendar_today Nov 05
person_add
J-918 Rush
Shell Oil

Emergency repair parts for platform.

calendar_today Oct 30
person_add

manufacturing In Production

8
J-882 Tomorrow
Shell Oil
Milling 75%
Dave S. Dave S.
check_circle
J-901 Nov 01
Chevron
Welding 20%
Maria G. Maria G.
warning

fact_check Quality Control

3
J-875 Due Today
ConocoPhillips
priority_high Awaiting final spec check on tolerances. Inspector notified.
Sarah J. Sarah J.

local_shipping Ready to Ship

5
J-850 check_circle
Valero

Packed on Pallet A4.

Customer Directory 5 CUSTOMERS

Customer Directory

Company Contact Revenue Jobs Margin Status Actions
Apex Engineering Sarah Jenkins $1.24M 142 32.4% Active
Gulf Coast Refining Mike Thompson $2.1M 89 28.5% Active
Texas Aero Parts David Rodriguez $890K 67 35.2% Active
BuildTech Construction Jennifer Smith $456K 34 30.1% Active
Metro Transit Auth Robert Chen $1.8M 156 25.5% Active

Reports & Analytics

calendar_month
Total Revenue account_balance_wallet

$425k

trending_up+8.4% vs last month
Avg Margin monitoring

32.4%

trending_down-1.2% vs last month
Quote Win Rate check_circle

68%

trending_up+4.0% vs last month
On-Time Delivery local_shipping

94%

horizontal_ruleUnchanged

Revenue vs. Cost

Revenue by Material Type

Alum 6061
45%
Steel A36
35%
Stainless 304
20%

Monthly Performance Breakdown

Month Quotes Sent Jobs Completed Total Revenue Margin %
May 2024 142 98 $124,500 34.2%
Apr 2024 156 105 $118,200 33.1%
Mar 2024 128 87 $95,400 31.5%
Feb 2024 115 82 $86,900 32.8%

General Settings

Manage your facility's core identity and location details.

Team Management

Manage access for estimators and floor managers.

USER ROLE STATUS ACTION
SM
Sarah Miller
sarah.m@vicco-os.com
Shop Manager Active
JD
John Davis
john.d@vicco-os.com
Estimator Active

Enhanced Client Portal

Comprehensive client collaboration and project management features.

photo_camera

Photo Documentation

Site Progress Photos 12 photos
image
image
add
edit_note

Change Orders

CO-2024-001 Pending
Additional welding work - $2,500
payments

Payment Processing

Invoice #INV-2024-089 Overdue
$4,500.00

Document Management

Document Type Uploaded Status Actions
Building Permit #2024-0892 Permit Oct 15, 2024 Approved
Insurance Certificate 2024 Insurance Oct 10, 2024 Active
Safety Plan - Site A Safety Oct 8, 2024 Review

Project Timeline & Milestones

Site Preparation Complete Completed
Oct 12, 2024 - Site cleared and leveled
Foundation Installation In Progress
Oct 15-22, 2024 - Concrete pouring and curing
Structural Framing Scheduled
Oct 25-Nov 5, 2024 - Steel erection and assembly

Project Estimation Tools

Calculate material quantities, labor costs, and project estimates.

square_foot

Square Footage Calculator

Total Area: 0 sq ft
inventory_2

Material Calculator

Total Cost: $0.00
engineering

Labor Cost Calculator

Total Labor Cost: $0.00

Current Project Estimate

Materials
$0.00
0 items
Labor
$0.00
0 hours
Overhead (15%)
$0.00
Profit margin
Total Estimate
$0.00
Estimated completion: TBD

Industry Configuration

Customize the platform for your specific trade and business needs.

precision_manufacturing

Metal Fabrication

CNC, welding, laser cutting

Selected
electrical_services

Electrical

Wiring, panels, automation

Available
plumbing

Plumbing

Pipes, fixtures, HVAC

Available
construction

Construction

Carpentry, concrete, framing

Available
landscape

Landscaping

Outdoor, irrigation, hardscape

Available
home_repair_service

General Contracting

Renovation, repair, maintenance

Available

Material Catalog

Material Category Unit Base Price Status
Aluminum 6061-T6 Metals per lb $2.45 Active
Steel A36 Metals per lb $1.85 Active
Stainless Steel 304 Metals per lb $3.20 Active
Copper C110 Electrical per lb $4.50 Inactive
PVC Pipe 1" Plumbing per ft $1.25 Active

Default Units of Measure

Length
Weight
Area
Volume

Industry-Specific Features

inventory_2
Material Inventory Tracking
Real-time stock levels across job sites
calculate
Auto Material Calculations
Calculate quantities from drawings
schedule
Labor Rate Tables
Trade-specific labor cost calculations
description
Custom Quote Templates
Industry-specific quote formats

Subcontractor Management

Invite subs to collaborate on projects, track their quotes and performance.

Total Subs groups
12
+2 this month
Active Projects construction
8
Currently engaged
Avg Rating star
4.7/5
Top performers
Pending Quotes description
5
Awaiting response

Subcontractor Directory

Company Specialty Contact Rating Active Projects Status Actions
Apex Electrical Services Electrical John Smith
star 4.8
3 Active
Quality Plumbing Co Plumbing Mike Johnson
star 4.5
2 Active
Foundation Masters Concrete Sarah Williams
star 4.9
1 On Hold
Precision HVAC HVAC David Brown
star 4.6
2 Active

Equipment Tracking

Manage tools, machinery, and vehicle fleets with maintenance schedules.

Total Equipment precision_manufacturing
48
+3 this month
In Use engineering
32
Currently deployed
Maintenance Due build
5
Requires attention
Available check_circle
11
Ready for deployment

Equipment Inventory

Equipment Type Location Status Maintenance Actions
CNC Milling Machine #1 Machinery Shop Floor A In Use Good
Welding Robot ARM-500 Robotics Shop Floor B Maintenance Due
Forklift Toyota 8FGU25 Vehicle Warehouse In Use Good
Laser Cutter Trumpf 3030 Machinery Shop Floor A In Use Good
Portable Generator Honda EU7000 Power Equipment Storage Available Good

Inventory Management

Track materials across multiple job sites with real-time inventory levels.

Total Items inventory_2
1,247
+45 this week
Low Stock warning
23
Reorder needed
Total Value attach_money
$89.2k
Current inventory
Locations location_on
8
Active sites

Inventory Overview

Item SKU Category Quantity Location Unit Cost Status Actions
Aluminum 6061 Sheet 0.25" AL-6061-025 Metals 450 Warehouse A $12.50 In Stock
Stainless Steel 304 Plate 0.5" SS-304-050 Metals 125 Warehouse B $45.00 In Stock
Copper Wire #12 AWG CU-WIRE-12 Electrical 8 Warehouse A $0.85/ft Low Stock
PVC Pipe 2" Schedule 40 PVC-PIPE-2 Plumbing 320 Job Site C $8.75 In Stock
MIG Welding Wire 0.035" MIG-WIRE-035 Consumables 12 Shop Floor $18.50 Low Stock

Financial Management

Invoice generation, expense tracking, and tax management.

Revenue YTD trending_up
$1.2M
+18% vs last year
Outstanding account_balance_wallet
$45.8k
Pending invoices
Expenses payments
$89.2k
This month
Tax Liability description
$12.4k
Q3 2024

Recent Invoices

Invoice # Customer Amount Date Due Date Status Actions
INV-1001 SpaceX Starbase $12,400.00 Oct 15, 2024 Nov 15, 2024 Paid
INV-1002 Boeing $67,800.00 Oct 18, 2024 Nov 18, 2024 Pending
INV-1003 Lockheed Martin $45,200.00 Oct 20, 2024 Nov 20, 2024 Overdue

Mobile Field App

Mobile-optimized interface for on-site data collection, photo uploads, and status updates.

photo_camera

Photo Documentation

Upload progress photos

mic

Voice Notes

Record site observations

location_on

GPS Tracking

Track team locations

wifi_off

Offline Mode

Work without internet

sync

Data Sync

Sync when reconnected

phone_android

Mobile Optimized

Touch-friendly interface

Recent Field Activity

photo_camera

Photo uploaded - Job J-882

2 hours ago

Quality inspection photos uploaded by Dave S.

mic

Voice note recorded - Job J-901

4 hours ago

Site observation: "Material delivery delayed by 2 hours"

location_on

GPS check-in - Job J-875

6 hours ago

Sarah J. checked in at ConocoPhillips site

Advanced Analytics

Profitability analysis, forecasting tools, and performance benchmarking.

Gross Margin trending_up
34.2%
+2.1% vs target
Project Profitability assessment
87%
Projects profitable
Team Productivity groups
92%
Above industry avg
Forecast Accuracy auto_graph
94%
Revenue predictions

Profitability by Project Type

Metal Fabrication 38%
Electrical 32%
Plumbing 28%
HVAC 45%

Revenue Forecast (Next 6 Months)

$120k
$165k
$195k
$225k
$255k
$285k
NovDecJanFebMarApr

Industry Benchmarking

Metric Your Performance Industry Average Top 10% Vs Industry
Gross Margin 34.2% 28.5% 42.0% +5.7%
On-Time Delivery 94% 87% 98% +7%
Customer Satisfaction 4.7/5 4.2/5 4.9/5 +0.5
Quote Win Rate 72% 58% 85% +14%

Compliance & Safety

Safety checklists, compliance tracking, weather integration, and resource planning.

Days Without Incident verified_user
127
Record: 245 days
Safety Compliance shield
98.5%
Audit score
Certifications workspace_premium
12
Active certificates
Weather Alerts cloud
2
Active warnings

Safety Checklists

check_circle

Daily Safety Inspection

Completed by Dave S.

Today, 8:00 AM
schedule

Equipment Safety Check

Pending assignment

Due today
check_circle

PPE Compliance Check

Completed by Maria G.

Yesterday

Compliance Tracking

verified

OSHA Certification

Valid until Dec 2025

Active
warning

Insurance Renewal

Expires in 30 days

Expiring
verified

Contractor License

Valid until Mar 2026

Active

Weather Integration & Resource Planning

Shop Floor

wb_sunny
72°F

Clear skies, ideal conditions

Job Site C

cloud
68°F

Partly cloudy, minor delays possible

Job Site D

thunderstorm
65°F

Storm warning, outdoor work suspended

Integration Ecosystem

Accounting software, mapping services, supplier networks, and government services.

account_balance

Accounting

3 connected

QuickBooks Connected
Xero Connected
Sage Setup
map

Mapping

2 connected

Google Maps Connected
MapQuest Connected
local_shipping

Suppliers

5 connected

MetalSupermarkets Connected
McMaster-Carr Connected
Grainger Connected
gavel

Government

1 connected

Permit Portal Connected
Inspection Scheduling Setup

Recent Integration Activity

account_balance

QuickBooks sync completed

1 hour ago

12 invoices synced, $45,200 revenue recorded

local_shipping

Order placed with McMaster-Carr

3 hours ago

45 items ordered, PO #MC-2024-1147

map

Route optimization completed

5 hours ago

3 job sites optimized, 25% fuel savings estimated

AI-Powered Features

Quote automation, risk assessment, schedule optimization, and image recognition.

auto_awesome

Quote Automation

AI-powered quoting

Accuracy 94%
Time Saved +65%
assessment

Risk Assessment

Project risk analysis

Projects Analyzed 156
Risk Reduction 42%
schedule

Schedule Optimization

AI-driven planning

Efficiency Gain +28%
On-Time Rate 96%
image_search

Image Recognition

Auto material ID

Images Processed 1,247
Accuracy 89%

Recent AI Activity

auto_awesome

AI Quote Generated

2 hours ago

RFQ #4921 quote generated with 94% confidence score

assessment

Risk Assessment Completed

4 hours ago

Job J-882: Low risk detected, confidence 87%

image_search

Material Identified

6 hours ago

Image recognition: Aluminum 6061-T6, 0.25" sheet (89% confidence)

Multi-Company Support

Parent/child company structure, resource sharing, centralized procurement, and consolidated reporting.

Company Structure

corporate_fare

Vicco Houston (Parent)

Houston, TX • Main Operations

Active
Revenue
$1.2M
Employees
45
Jobs
18
business
Vicco Austin

Austin, TX • Child Company

Active
business
Vicco Dallas

Dallas, TX • Child Company

Active
business
Vicco San Antonio

San Antonio, TX • Child Company

Setup

Resource Sharing

precision_manufacturing Equipment Pool
12 shared
inventory_2 Inventory
8 locations
groups Personnel
6 rotations
payments Budget Pool
$250k

Consolidated Executive Dashboard

Total Revenue
$2.8M
+15% vs last quarter
Combined Margin
31.8%
Across all locations
Total Employees
127
4 locations
Active Jobs
52
Company-wide

Support & Help Center

Find answers to technical questions, workflow guides, and contact shop support.

search

Frequently Asked Questions

How to import STEP files

Navigate to the RFQs module and click 'New Quote'. In the file upload section, select 'Import 3D Model' and choose your .STEP or .STP file. The system will automatically run a manufacturability analysis within 30 seconds.

Changing job priorities

Job priorities can only be adjusted by Production Managers. Go to the Production tab, locate the active job, and select 'Edit Properties'. Changing a job to 'Rush' requires overriding current machine scheduling.

Setting up customer portal

Under the Customers module, select the specific client profile and toggle 'Portal Access' to active. An automated email with temporary credentials will be sent to their primary contact address.

Account Settings

Manage your profile, security preferences, and active subscriptions.

person

Profile Information

Profile Avatar
photo_camera
tune

Preferences

Interface Theme

Data Density

security

Security

Password

Last changed 45 days ago

Two-Factor Auth

Add an extra layer of security

Enabled
verified

Subscription

Current Plan
Shop Pro / Annually
check_circle Unlimited RFQs
check_circle Advanced Inventory Analytics
check_circle Up to 15 Seats

Submit New Request for Quote

Upload CAD files and specify requirements.

cloud_upload
upload_file

Drag & Drop files here

Accepted formats: .DXF, .DWG, .STEP, .PDF (Max 50MB per file)

Attached Files (1)

description bracket_v2.step 4.2 MB

history Active RFQs

RFQ # Part Status
RFQ-9021 Mounting Bracket Assm Received
RFQ-9018 Custom Enclosure Quoting
RFQ-8995 Heat Sink Extrusion In Production
RFQ-8810 Base Plate Shipped

shopping_cart Quick Reorder

Machined Bracket
Bracket_X_500 Alum 6061 • Last ordered: Oct 12
square
Base_Plate_RevB CRS 1018 • Last ordered: Sep 05
Sheet metal enclosure
Enclosure_Cover SS 304 • Last ordered: Aug 22